Monday, April 20, 2009

The big blue box

The rain stopped just in time. Installed the roof Saturday afternoon. And with help from my father, some of the walls on Sunday. Once the windows show up I can finish the walls. In another week, I could have it enclosed and water proof.


Thursday, April 9, 2009

Little behind on taking pictures

I'm close to installing the sheet metal. The wind was high today so the pictures are from ground level. Can't have to much wind bracing.





Sunday, March 22, 2009

First Week

My first week framing went well. I wasn't able to get the whole building in the picture. I'll take more when the wind slows down later in the week. Next up is the decking.

Friday, March 6, 2009

The Slab

I'm slow to post the picture but the slab was poured last friday. In another week or two I'll set the walls. I don't want to rush it since I'm drilling in the slab to tie the walls down.


Friday, February 20, 2009

Moving On

Started the garage last week. Should have the slab poured by the end of next week. I'm going to build it out of c-purlins (metal studs) with metal siding.

Thursday, January 15, 2009

I'm still working on it.

Lately I have been working on welding everything I tacked in place. I also finished removing the container roofs on the second floor.

Next up is framing the openings for the windows.

Sunday, January 4, 2009

Working on the second floor

I'm working on removing the roof of the containers on the second floor. You can see the pitch of the roof in one of the pictures.